Photovoltaics

The company is active in the design and construction of photovoltaic installations.

Details such as dimensions (of terrace, roof, field, etc.), orientation, slope, location, owner’s wishes are taken into account when drawing up the design for the selection of pv-panels, mounting racks , inverters, cables, etc., leading up to the construction of the project. We maintain assured quality at all stages of the process.

Example: To implement a pv-field of 10kW at a house loft we need about 150 sq.m. open space (at the latitude of Attica). There is a wide range of options available, of pv-panels tailored to each case.(The same applies to mounting racks, of makes such as SCHUECO, SCHLETTER, KRINNER).

1. (Mono-and poly-) crystalline pv-panels with higher production of energy at peak sunlight.Mounting racks are installed to support them.We mention indicatively the brands ALEO, SCHUECO, SHARP, SCHOTT, MITSUBISHI.

2.Transparent and semitransparent pv-panels, replacing normal glass (and/or insulating) frames.They have been implanted with electrical cables for easy connection to an inverter.We mention brands SCHUECO, SCHOTT, SCHEUTEN.

3.Noncrystalline pv-panels based on thin-film or amorphous silicon technologies, certified for balanced energy production under conditions of both peak sunlight and scattered light, such as cloudy skies, dusk. Indicatively we mention the brands SCHUECO, FIRST SOLAR, WUERTH, SOLYNDRA.

4.The technologies of thin-film and amorphous silicon are offered also as flexible mats for paving surfaces(UNISOLAR), and glassframes implanted with cable (SCHUECO, SCHOTT). All are offered in various sizes and power (W), so there is a solution for each specific case.

The wiring leads to the inverter and further to Public Power Corp.(DEI) KWH-counter, that the DEI installs on request, after the recently updated law.The delivery of this energy is invoiced and paid, upon signing of a contract between the investor and the Public Utility (Desmie) , with a duration of 20 years. Energy study accompanies the project and clarifies the expected annual income of the owner, and the amortisation period. The latitude, azimuth, slope and type of selected pv-panels and the electrical data of the inverters determine the expected amount of income. The installation is supplemented by the necessary protection against overvoltages and lightning, so insurance companies will undertake the risk.

There is the possibility of continuous operation monitoring of the project via the Internet or a mobile (SIM) phonecard.